产品推荐
RECOMMEND新闻推荐
NEWS RECOMMENDATION定购的岩棉板要如何验收及标准都有哪些你晓得么?
发布时间:2021-07-27 来源:http://www.jnhxtcg.com/
随着越来越多的岩棉板用于外墙,购买量也在增加。哪么定购的岩棉板要如何验收及标准都有哪些你晓得么?以下济南岩棉板厂家整理了一些资料与大家分享,希望能给大家带来帮助。
As more and more rock wool boards are used for exterior walls, the purchase volume is also increasing. Do you know how to accept the ordered rock wool board and what are the standards? The following Jinan rock wool board manufacturers have sorted out some information to share with you, hoping to bring you help.
1、颜色:保持颜色的整体一致性是外墙岩棉板的次要要求。原来的状态是不透明的。如果色彩分布不均匀,视觉效果会很差。
Color: maintaining the overall consistency of color is a secondary requirement for rock wool board of exterior wall. The original state is opaque. If the color distribution is uneven, the visual effect will be very poor.
2、表面光洁度:这是外墙岩棉板的基本标准。通常合格产品手感好,外墙岩棉板视觉接受效果好。无褶皱、缝隙小、消泡、翘边。
2. Surface finish: This is the basic standard of rock wool board for exterior wall. Generally, the qualified products have good hand feel and good visual acceptance effect of rock wool board for exterior wall. No fold, small gap, defoaming and edge warping.
3、密封性:脱胶处外壁岩棉板间距很小,管接头紧密。一般需要脱胶位置之间的间隔小于20cm2。外墙岩棉板与其他材料完全紧密接触3mm。
3. Tightness: the spacing between rock wool boards on the outer wall of the degumming place is very small, and the pipe joints are tight. Generally, the interval between degumming positions shall be less than 20cm2. The rock wool board of the outer wall shall be in full close contact with other materials for 3mm.
外墙岩棉板施工前,施工前应做好准备工作:外墙砌体施工、局部突起物处理、外墙窗框检查、墙体竣工。结束工作。并根据现场实际情况,制作样板,完成样板施工及验收,然后进行大规模施工。
Before the construction of external wall rock wool board, preparations shall be made before construction: external wall masonry construction, local protrusion treatment, external wall window frame inspection and wall completion. power cut-off. According to the actual situation of the site, make the template, complete the template construction and acceptance, and then carry out large-scale construction.
其次,班组长和工人在建造外墙岩棉板前一定接受安 全技术培训。施工应严格按照安 全技术交底的要求进行。提前准备好主要材料。之后做好锚固施工,外墙岩棉板安装能够正常进行。
Secondly, the team leader and workers must receive safety technical training before building the rock wool board of the outer wall. The construction shall be carried out in strict accordance with the requirements of safety technical disclosure. Prepare main materials in advance. After that, the anchoring construction shall be completed, and the rock wool board installation of the outer wall can be carried out normally.
这种外墙岩棉板是一种优良的不燃材料。在80摄氏度的高温下,仍然可以保持稳定的性能,不会造成任何损害。它的导热性也相对较低,不会造成事故。热量会传递到其他物体上,阻燃性强,硬度好,遇到硬物不会划伤。
The external wall rock wool board is an excellent non combustible material. Under the high temperature of 80 ℃, it can still maintain stable performance without causing any damage. Its thermal conductivity is also relatively low and will not cause accidents. Heat will be transferred to other objects. It has strong flame retardancy and good hardness. It will not be scratched when encountering hard objects.
外墙岩棉板的生产过程需要经过成型、切边、开槽等工序。产品结构完整。遇到很大压力时,受力点很一般,可以承受很大阻力,颜色也会变化,可以根据客户需求配置。
The production process of exterior wall rock wool board needs to go through forming, trimming, slotting and other processes. The product structure is complete. In case of great pressure, the force bearing point is very general, which can withstand great resistance, and the color will change. It can be configured according to customer needs.
热门产品 / HOT PRODUCT