我们又可以称之为是硅钙板。石膏复合板是一种较常见的保温材料,被广泛的应用于室内隔墙保温。但是你知道石膏复合板隔墙保温施工流程都包含了哪些吗?
We can also call it silicon calcium board. Gypsum composite board is a common thermal insulation material, which is widely used in indoor partition insulation. But do you know what is included in the construction process of gypsum composite board partition insulation?
墙位放线:按照设计图纸在楼地面、墙面、顶面和主体结构墙面弹出定位线和边线,并弹出门窗口线。墙基施工:墙基施工前,楼地面应进行毛化处理,并涂刷固央墙地界面宝,现浇墙基混凝土。
Wall setting out: snap positioning lines and sidelines on the floor, wall, top and main structure wall according to the design drawings, and snap the door and window opening lines. Wall foundation construction: before the construction of wall foundation, the floor shall be roughened, painted with solid central wall ground interface, and cast-in-situ wall foundation concrete.
济南泡沫复合板
预排:量准隔墙净空高度、宽度及门窗口尺寸,在地面上进行预排列。设有门窗的隔墙,应先安装窗口上、下和门上的短板,再顺序安装门窗口两侧的隔墙板,如剩余墙宽不足整板时,则按实际墙宽补板。
Pre arrangement: measure the clearance height and width of the partition wall and the size of the door and window, and pre arrange it on the ground. For the partition wall with doors and windows, the short plates on the upper, lower and door of the window shall be installed first, and then the partition plates on both sides of the door and window shall be installed in sequence. If the remaining wall width is less than the whole plate, the plate shall be supplemented according to the actual wall width.
安装:石膏复合板安装时,在板的顶面、侧面和板与板之间,均匀涂抹一层胶黏剂,然后上下顶紧,侧面要严实,缝内胶黏剂要饱满。板下所塞木楔,一般不撤除,但不得露出墙外。首块石膏复合板安装好后,要检查其垂直度,继续安装时,须上,下横靠检查尺,开与板面找平当板面不平时,应及时纠正复合板与两端主体结构连接要牢固。
Installation: during the installation of gypsum composite board, apply a layer of adhesive evenly on the top and side of the board and between the board and the board, and then press it up and down. The side should be tight and the adhesive in the joint should be full. The wooden wedge under the slab shall not be removed generally, but shall not be exposed outside the wall. After the first gypsum composite board is installed, its perpendicularity shall be checked. When continuing the installation, it must lean against the inspection ruler up and down, open and level with the board surface. When the board surface is uneven, it shall be corrected in time, and the connection between the composite board and the main structure at both ends shall be firm.
以上就是今天带给大家的知识济南泡沫复合板专注行业多年,为用户不断的提供有价值的内容,更多内容请继续关注我们:http://www.jnhxtcg.com
The above is the knowledge that we bring to you today. Ji'nan foam composite board has been focusing on the industry for many years, providing users with valuable content continuously. http://www.jnhxtcg.com